Case Studies
From billion-dollar semiconductor facilities to cutting-edge solar manufacturing plants, OnQCx transforms complex challenges into operational triumphs. Explore our case studies to see how our commissioning, quality assurance, and MEP expertise drive results across industries.
-
$20B Semiconductor Facility – Full-Scope Commissioning & Construction Support
OnQCx is proud to support one of the largest and most technically complex semiconductor facility projects in the world. This $20 billion development includes: Two state-of-the-art Fabrication Plants (FABs) A Process Utility Building A Central Utility Plant An Emergency Generator…
-
Tesla Gigafactory – Control System Pre-Commissioning/ Commissioning
The Tesla Gigafactory, located in Sparks, Nevada, is one of the most ambitious industrial projects in the world, supporting Tesla’s production of advanced batteries and electric vehicles. This case study focuses on the pre-commissioning activities undertaken for Sections A/B/C/D/E and…
-
OnQCx MEP Support Services
OnQCx, headquartered in Nevada, specializes in Owner’s Representative Project Management (ORPM) and Construction Execution Supervision services. With a proven track record of successful collaborations with high-tech and chemical manufacturing clients, OnQCx provides expertise across the domestic U.S. in 15 states…
-
Mastering Multi-Site Data Center Management
Faced with the complexities of multi-year, multi-site data center construction programs in Oklahoma and Ohio, a confidential client partnered with OnQCx to overcome limited organizational experience and expertise gaps in critical areas. OnQCx addressed these challenges by deploying specialized project…
-
Project Redeemer – QCells Solar Panel Manufacturing Facility
Client: Gray Construction Location: Cartersville, GA Staff Size: 18 Cost to Date: $7M Scope: Multi-billion-dollar solar panel manufacturing facility
-
Champion Pet Foods Project
Champion Pet Foods embarked on a major process and packaging systems integration project to enhance production efficiency and streamline operations. The project involved incorporating multiple vendor skids into a unified supervisory control system. The complexity of the integration required meticulous…