Home  >  Case Studies  >  Champion Pet Foods Project

Champion Pet Foods Project

Commissioning

Food & Beverage

Project Overview


Champion Pet Foods embarked on a major process and packaging systems integration project to enhance production efficiency and streamline operations. The project involved incorporating multiple vendor skids into a unified supervisory control system. The complexity of the integration required meticulous oversight and technical expertise across multiple disciplines.


Role of OnQCx

OnQCx played a pivotal role in ensuring the success of the project through comprehensive staff augmentation and technical services. Key contributions included:

  1. System Integration Management
    • Coordinated efforts between the Systems Integration (SI) contractor and multiple vendors to seamlessly integrate equipment into one supervisory system.
    • Reviewed and validated code, screens, and graphics associated with the equipment provided by vendors.
  2. Pre-Commissioning and Commissioning Support:
    • Oversaw and supported pre-commissioning and commissioning activities for process systems to ensure proper functionality and compliance with project specifications.
  3. Packaging Line Augmentation:
    • Provided PLC, Control Panel Design, Fabrication, and commissioning support during peak construction periods to complement the efforts of onsite personnel.

Challenges

The project involved addressing challenges such as:

  • Coordinating integration efforts across multiple vendors with varying system specifications.
  • Managing peak workloads and ensuring adequate staffing during critical construction phases.
  • Maintaining seamless communication among stakeholders to prevent delays in functionality implementation.

Results

OnQCx’s involvement enabled Champion Pet Foods to achieve the following:

  • Successful integration of vendor systems into a centralized supervisory system.
  • Efficient commissioning and operation of process systems.
  • Streamlined production processes with augmented packaging line capabilities.

Conclusion

OnQCx’s technical expertise and staff augmentation services were integral to the project’s success. The team’s ability to manage complex integrations and provide reliable commissioning support underscored their value as a trusted partner in large-scale process system projects.


More Case Studies


  • $20B Semiconductor Facility – Full-Scope Commissioning & Construction Support


    OnQCx is proud to support one of the largest and most technically complex semiconductor facility projects in the world.  This $20 billion development includes: Two state-of-the-art Fabrication Plants (FABs) A Process Utility Building A Central Utility Plant An Emergency Generator Building A Facility Support Building Designed to set a new bench

    Learn More

  • Tesla Gigafactory – Control System Pre-Commissioning/ Commissioning


    The Tesla Gigafactory, located in Sparks, Nevada, is one of the most ambitious industrial projects in the world, supporting Tesla’s production of advanced batteries and electric vehicles. This case study focuses on the pre-commissioning activities undertaken for Sections A/B/C/D/E and the Yard Control System as part of the ongoing factory buildout.

    Learn More

  • OnQCx MEP Support Services


    OnQCx, headquartered in Nevada, specializes in Owner’s Representative Project Management (ORPM) and Construction Execution Supervision services. With a proven track record of successful collaborations with high-tech and chemical manufacturing clients, OnQCx provides expertise across the domestic U.S. in 15 states and supports some of the largest General Contractors on complex projects like data centers and…

    Learn More