How We Plan and Coordinate for Success


We start by diving deep into your project’s needs, crafting a tailored commissioning plan that aligns with your vision. Our team of MEP (mechanical, electrical, process) and I&C (instrumentation and controls) experts collaborates across disciplines to map out system interdependencies. This allows us to schedule and execute commissioning activities starting with the end in mind, bridging the gap between contractors and owners to deliver a fully functional facility.

How We Test and Verify Performance


Our commissioning process revolves around rigorous testing to ensure your systems perform under real-world conditions. We develop detailed test scripts based on approved Sequence of Operations (SOOs) and cause-and-effect diagrams. These scripts guide our field testing, which includes:

  • Pre-functional testing to confirm proper equipment installation and readiness.
  • Functional performance testing to verify individual system operations, such as alarms, redundancies, and safety interlocks.
  • Integrated system testing to ensure all components work together seamlessly.

We also incorporate load testing to evaluate performance under a simulated full operation load to validate system stability under predictable conditions. Where possible, we automate tests to deliver consistent, repeatable results, saving time and enhancing reliability.

Our Commissioning Checklist


Our commissioning checklists are dynamic tools that guide every phase of the process, ensuring no detail is overlooked. Our checklists are aligned with ASHRAE and Building Commissioning Association (BCxA) standards and customized to your unique project.

Developed by our Commissioning Agents and Professionals (CxA and CxP), these checklists align with standards from ASHRAE and the Building Commissioning Association (BCxA) and vary by phase: 

L1

Factory witness testing to validate equipment performance before delivery.  

L2

Equipment receipt inspection and installation verification to confirm proper setup.

L3

Energization, pre-functional testing, and vendor startup to prepare equipment and components for operation.

L4

Functional performance testing to assess individual system functionality.

L5

Integrated system testing to ensure all components work together seamlessly.

This structured approach, embedded in the commissioning plan, supports both new and existing buildings and ensures that commissioned buildings operate reliably. Need an example? We can provide a sample checklist tailored to your project!